Language
Current Location:Home > News > Industry News

Installation and operation of soda machines?

[list:visits]

1. Take out the soda maker from the box, hold the front of the machine with one hand, press the buttons on both sides of the back of the machine with the other hand and thumb, lift it up after light pressure and remove the back cover.

2. Remove the CO2 cylinder and place the cylinder in the back of the soda maker sitting in neutral, lift the main unit slightly, align the copper connector of the cylinder with the connector of the main unit and tighten it in a clockwise direction.

3. Press the panel so that the water bottle is lifted and removed, fill the water bottle to the scale line (please depend on the condition of the water bottle), then put the water bottle on the main machine and tighten it.

4. So far you have completed all the installation work of the soda machine, please double check before operation.